Rendering of the new Campus’s main façade
MiSion

FAITHFUL MESSENGERS FOR THE GREAT COMMISSION

New Campus

VISION

The Lord told us to ask the Father to send workers into the harvest, because the fields are ready but the workers are few. For us, asking means praying and working, devoting our lives to preparing messengers who will fill Latin America with the knowledge of the glory of the Lord and the Gospel of the Kingdom. They will go to the Middle East, to Israel and the Arab countries, to preach the Good News in every nation and prepare the way for the Lord to return and take His rightful place on earth.

It is an honor to be part of God’s plan, to find our place in the prophecies and to be allowed to take part in the great final harvest described in Scripture (Matt. 24:14; Rev. 7:9; 14:6). Over these twenty-one years, we have trained and sent thousands of workers to the nations, equipping them in every area according to the fivefold ministry described in Ephesians 4.

Architectural rendering of the Campus

THE PURPOSE OF THE CAMPUS

In recent years, we have grown significantly as students from Buenos Aires and other nations have traveled long distances to study with us. We believe this awakening comes from being part of the generation that will see the second coming of Jesus (Matt. 24:1–35; Rev. 19:7). Our current facilities cannot accommodate everyone who wants to train here, encounter God and take part in His eternal plan.

Photograph of Instituto MiSion

IMMERSED IN HIS STORY

Recognizing the times we live in and the urgent need to prepare the way for the King, we have said yes to BUILDING A CAMPUS to carry out the assignment God has given us. Its foremost purpose will be to host His Presence. It will be a place of refuge and spiritual renewal for the nations (Isa. 55:5; 56:6–7) and a space where more people can receive comprehensive training and be equipped to receive and proclaim the Gospel and prepare the way for the return of our Lord Jesus Christ in their churches and cities (Isa. 40:6–11; 42:5–13).

Photograph of the Instituto MiSion community

This CAMPUS will feature:

  • An auditorium for more than 2000 people
  • Classrooms for more than 600 people
  • Classrooms for more than 300 people
  • Offices
  • Café
  • Study spaces

And other spaces designed to train this generation.

This will allow our current facilities to be dedicated entirely to a 24/7 house of prayer, where God dwells among us.

BE PART OF GOD’S DREAMBE PART OF HIS STORY!

We invite you to be part of this expansion as an investment in establishing and advancing the Kingdom of God (Matt. 6:19–21).

Every contribution will be a foundation stone in building this place consecrated to the Lord.

Progress

  1. Land purchase✓
    7%
  2. ✓ January to December 20251 Foundations and general structure
    11%
  3. January 2025 to February 20282 Main auditorium, front area and fellowship spaces
    40%
  4. March 20293 Classrooms, offices and parking
    42%
Project total 100%
  1. January to March 2025:

    • Prepared the ground across the entire building footprint.
    • Built and poured concrete for 64 foundations supporting the whole building.
    • Installed sewer and drainage pipes.
    • Set aside conduits for the fire protection systems.
    • Completed the tie beams.
    • Poured concrete for 100% of the building’s floor.
  2. April to September 2025:

    • Formwork and concrete pouring for columns and beams (slab 1 – front of the building).
    • Installation of precast slab panels (slab 1 – front of the building).
    • Pouring of the solid concrete slab (slab 1 – front of the building).
    • Installation of the site entrance gate.
    • Construction of an administrative office, changing rooms, dining area and materials yard.
    • Formwork and concrete pouring for columns and beams (slab 2 – front of the building).
    • Installation of precast slab panels (slab 2 – front of the building).
    • Pouring of the solid concrete slab (slab 2 – front of the building).
    • Installation of the site entrance gate.
    • Construction of an administrative office, changing rooms, dining area and materials yard.
    • Formwork and concrete pouring for columns and beams (slab 3 – front of the building).
    • Installation of precast slab panels (slab 3 – front of the building).
    • Pouring of the solid concrete slab (slab 3 – front of the building).
    • Installation of the site entrance gate.
    • Construction of an administrative office, changing rooms, dining area and materials yard.
  3. October to November 2025:

    • Formwork and concrete pouring for columns and beams (slab 1 – classrooms, main auditorium, offices and restrooms).
    • Pouring of the solid concrete slab (slab 1 – classrooms, main auditorium, offices and restrooms).
    • Stairs over the ground-floor café lobby.
  4. December 2025:

    • Formwork and concrete pouring for columns and beams (slab 2 – main auditorium).
    • Formwork and concrete pouring for the stands’ columns and beams (slab 2 – main auditorium).
    • Slab to support water tanks (terrace – slab 3, front of the building).
    • Main staircase to the auditorium.
Campus video